Differential Settlement
Fifth International Conference on Geotextiles, Geomembranes
and Related Products
Singapore, 5-9 September 1994
K. Badu-Tweneboah & N. D. Williams
GeoSyntec Consultants, Boca Raton, FL, USA
D. W. Haubeil
Mead Paper, Chillicothe, OH, USA
ABSTRACT:
A polyvinyl chloride (PVC) geomembrane was used in combination with a geosynthetic clay liner (GCL) as a composite barrier in the cover system for the final closure of a paper mill sludge landfill. The landfill contained very compressible and low shear strength wastewater treatment sludge materials. During placement of a vegetative cover soil layer over an installed cover system panel, localized bearing capacity failure of the underlying sludge material occurred. As a result, the geosynthetics settled up to 2.4 m in a certain area. Geomembrane samples with and without seam were taken from the affected area for laboratory tests. The test results indicated that the mechanical properties of the geomembrane and seam exceeded the minimum requirements of the project specifications and were within the range of conformance test results. These results confirmed that PVC geomembranes are suitable for landfil1 cover system applications where settlement of the underlying waste may result in large stresses and strains in the geomembrane cover system.
1. INTRODUCTION
The purpose of this paper is to present the performance of a
PVC geomembrane during construction of a final cover system for a highly
compressible sludge landfill. The PVC geomembrane was selected on the
basis of its mechanical properties, in particular its ability to
tolerate large settlements. During construction of the final cover
system, construction equipment caused large settlements of a portion of
the installed cover system including the geomembrane. There was
therefore concern over the integrity of the geomembrane. The results of
the laboratory tests performed on the affected geomembrane and seam are
presented and compared with the project specifications and results of
conformance tests performed as part of
construction quality assurance monitoring.
2. HISTORY OF THE LANDFILL
The landfill was constructed in 1974 for the disposal of wastewater treatment plant primary and secondary sludges, coal ash, and lime mud, which were waste byproducts of the pulp and paper manufacturing process. These waste byproducts, when combined, were typically fully saturated, with water contents in excess of 200 percent and shear strengths that ranged from 1 to 10 kPa. The sludges were very compressible and generated considerable leachate through consolidation under self-weight. Results of laboratory consolidation tests indicated that the modified compression index, Cc, for the sludge was in excess of 0.30. The sludge had a very low bearing capacity because of its low shear strength. This had a direct impact on disposal operations and construction of the cover system for final closure of the facility.
The landfill covered approximately 10 hectares and had been developed by constructing a l5-m high embankment at the mouth of a small ravine to create the space for sludge disposal. The maximum depth of sludge in the landfill occurred at the lowest elevation of the ravine and was approximately 15 m; the average depth of sludge was about 9 m. In 1990, an innovative cover system that incorporated eight layers of geosynthetics was designed for final closure of the landfill facility. Construction of the final cover system began in June 1992 and was completed in January 1993 (Badu-Tweneboah et al., 1994).
3. FINAL COVER SYSTEM COMPONENTS
Fig. 1 illustrates the profile of the final cover system, which was designed and constructed for closure of the landfill. The purpose of the 0.75-m thick vegetative cover was to support vegetation as well as protect the underlying layers from root penetration and frost damage. The geocomposite drainage layer immediately below the vegetative cover layer served as an infiltration collection and removal system (ICRS) for the control of precipitation that infiltrated through the vegetative cover layer. The composite barrier consisted of a O.5-mm thick PVC geomembrane placed on top of a GCL. The purpose of the composite barrier was to: (i) minimize leakage of precipitation into the landfill, thereby minimizing the rate and quantity of leachate generation; (ii) minimize upward migration of leachate out of the Iandfill; and (iii) reduce the volume and rate of gas discharged to the atmosphere through the final cover system. Below the composite barrier was a geocomposite layer that served as an underdrain layer for the collection and removal of leachate expelled from the sludge due to consolidation caused by placement of the final cover system and by self-weight. This underdrain layer also served as a gas collection layer for the control of gas migration from the landfill.
Each of the two geocomposite drainage layers consisted of a layer of geonet placed between two needlepunched nonwoven geotextile layers. The geotextiles functioned as filters and/or separators.
The geosynthetics were used as the major components of the cover system in lieu of conventional earthen construction materials in order to reduce the vertical stress applied to the sludge, thereby decreasing the total settlement and the volume of leachate generated due to consolidation of the waste.
To facilitate placement of the vegetative cover soil and to support the weight of construction equipment, a 3-m to 6-m thick layer of stabilized sludge was placed above the in-place sludge. The stabilized sludge consisted of sludge mixed with hark and fly ash to provide a minimum undrained shear strength of 24 kPa (Badu-Tweneboah et al., 1994). Construction specifications required the use of low ground pressure dozers with a maximum ground pressure of 34 kPa for placement of the 0.75 m vegetative cover soil layer.

Fig. 1 Final cover system profile.
4. PVC GEOMEMBRANE INSTALLATION
The PVC geomembrane rolls were factory-fabricated into 40 panels with a width of 21 m. The total area of the PVC geomembrane installed over the landfill was measured to be 102,680 m2. A total of l4 samples were retrieved from the 40 fabricated panels for laboratory conformance testing. The results of the conformance tests were compared with the project specifications to ensure conformance with the material property requirements.
Adjacent PVC geomembrane panels were bonded in the field using a solvent-adhesive welding technique. The completed PVC geomembrane seams were visually examined for workmanship and continuity. Nondestructive and destructive tests were performed to evaluate the integrity of the field seams. The air lance testing method was used to nondestructively test the field seams in order to evaluate their continuity. Laboratory destructive testing was performed to evaluate the strength of the field seams. Testing was performed to determine the bonded seam strength and peel adhesion using the test methods provided in ASTM test standards (ASTM, 1991). The overlying layers were immediately installed after acceptable results had been obtained for the field seams.
5. PLACEMENT OF COVER SOIL
Low ground pressure dozers were used to place the O.75-m thick layer of
vegetative cover soil over installed panels. The cover soil materials
were hauled from the landfill perimeter and spread over the installed
geosynthetics using the low ground pressure dozers. It was necessary to
use closed portions of the landfill as haul roads to facilitate
placement of cover soil in other areas. As a result, closed portions
were Subjected to repeated loading from the combined weight of
construction equipment and cover soil materials which subsequently led
to pumping of the subgrade. Pumping of the very low shear strength,
fully saturated sludge into the stabilized sludge layer progressively
reduced the shear strength of the stabilized sludge layer. This led to
the development of localized bulges, and at times placement of excessive
thickness of soil (Badu-Tweneboah et al., 1994). Placement of excessive
thickness of soil caused immediate settlement, which was difficult to
observe because the depressed (i.e. settled) area was filled immediately
with soil as the dozer trafficked the area with cover soil.
As a result of placement of excessive thickness of soil, localized bearing capacity failure of the underlying subgrade material occurred in a 60-m long by 18-m wide area of an installed panel; this area is hereafter referred to as the affected area (Fig. 2).
Fig. 2 A view of the localized bearing capacity failure caused by placement of excessive thickness of soil.
6. FAILURE INVESTIGATIONS AND CORRECTIVE ACTIONS
Test holes were excavated to determine the thickness of cover soil placed over the geosynthetics in the affected area. Fig. 3 shows a profile of the thickness of cover soil and settlement of the geosynthetics.
Fig. 3 Profile showing thickness of cover soil and settlement of geosynthetics in the affected area.
The figure shows that up to 3.7 m of soil was placed in one area. The 3.7 m of cover soil corresponded to an applied stress of about 70 kPa, which greatly exceeded the design strength of the stabilized sludge subgrade. The settlement of the geosynthetics in the affected area was determined to range from 0.10 to 2.4 m.
Fig. 4 Removal of cover soil for inspection of geosynthetics for damage or seam separation.
It was observed that the cohesive nature of the cover soils caused them to stick to the top geotextile component of the ICRS geocomposite drainage layer. These geosynthetic layers were therefore damaged during the cover soil removal process. The geomembrane showed signs of tension in the form of Iateral wrinkling but had no tears, scratches, or separated seams, except for few locations which were torn by the backhoe. However, the underlying geosynthetics, particularly, the GCL were observed to have had seam separation.
The affected area was subsequently repaired by: (i) removing
all cover soil and geosynthetics; (ii) restabilizing the sludge with
bark and regrading the surface; and (iii) reinstalling the cover system
using new geosynthetic materials. Placement of the cover soil over this
area was performed using low ground pressure dozers much smaller than
those used in the initial stages of construction. Additional grade
control measures were instituted to ensure that not more than the
required 0.75 m of cover soil was placed over the installed
geosynthetics.
7. INTEGRITY OF PVC GEOMEMBRANE
In the area where localized bearing capacity failure occurred, a sample from the PVC geomembrane parent material and a sample from the adjacent field seam were taken for laboratory conformance testing to evaluate the integrity of the geomembrane material and field seam. Testing was performed in accordance with ASTM test standards (ASTM, 1991). The results of the laboratory testing are summarized in Tables 1 and 2.
Table 1 presents a summary of the results of tests on the
physical and mechanical properties of the PVC geomembrane field sample
compared with the project specifications and conformance test results.
These results indicate that the mechanical properties of the PVC
geomembrane which was subjected to the loading from the 3.7 m of cover
soil still exceeded the minimum requirements of the specifications and
were within the range of conformance test results obtained from the
geomembrane panels. Even though visual observations indicated signs of
tension in the geomembrane, its mechanical properties were still within
the range of conformance test results.
Table 2 presents a similar comparison of the PVC geomembrane field seam sample with the project specifications. Again, the mechanical property values of the field seam sample exceeded the specifications. Based upon the results of the laboratory testing and comparison with the specifications, it was concluded that the integrity of the PVC geomembrane had not been affected by the stresses imposed by the loading from the 3.7 m of cover soil. These results confirmed that PVC geomembranes are suitable for landfill cover system applications where settlement of the underlying waste may result in large stresses and strains in the geomembrane cover system.
8. CONCLUSIONS AND RECOMMENDATIONS
The performance of a PVC geomembrane subjected to excess loading during
construction of a final cover system over a very compressible, low shear
strength waste material has been presented in this paper. Results of
laboratory tests and comparison with the specifications and conformance
test results showed that the PVC geomembrane and field seam were not
impacted enough by the large stresses and strains imposed by the excess
loading caused during construction to affect the integrity of the
geomembrane. Therefore, PVC geomembranes are acceptable for construction
over very compressible, low shear strength
waste materials. To facilitate construction, however, stabilization of
the upper few meters of the waste material may be required. Also, proper
placement of cover soil may be necessary in order to minimize the
development of bulges and localized bearing capacity failure. This can
be accomplished by using lightweight
equipment.
REFERENCES
ASTM (1991) Annual Book of ASTM Standards,
Philadelphia, Vol. 08.01, 556 p.
Badu-Tweneboah, K., Williams, N.D., and Haubeil,
D.W. (1994) Closure of a paper mill sludge 1andfill,
Proceedings of 1994 lnternational Environmental
Conference, TAPPI, Portland, OR, USA, 1: 117-130.







.jpg)