Shanty Creek Waste Water Treatment Plant

Problem:

A growing northern Michigan resort needed a new waste water treatment system to handle increased usage by their expanding residential development.  But the soils at the new treatment plant site would not provide the low permeability required for this application.

Solution:

Shanty Creek Resort in Bellaire, MI retained Progressive Architects Engineers and Planners, Inc. who specified 40 mil PVC geomembrane to provide the protection needed to eliminate any ground water contamination.

Dan & Fred

Fred & Dan planning the days work

Manthei Development of Charlevoix, MI contracted with EPI to fabricate and install 52,900 square feet of 40 mil PVC in the primary pond and 60,438 square feet of 40 mil PVC in the secondary pond.

40 mil PVC geomembrane

40 mil PVC was fabricated into large custom built panels to fit each pond exactly and to minimize the length of field seams required.

40 mil PVC Geomembrane

Six panels were installed in the secondary pond on the first day.  Field seams were constructed using chemical fusion welding and all field seams were air lance tested to insure continuity of every inch of seam.  Destructive samples were removed for laboratory testing at the rate of one per every 500 lineal feet of field seam.

Stabilization Pond

The PVC geomembrane was sealed around inlet and outlet pipes using PVC pipe boots.

Feild Welding 40 mil PVC Geomembrane

The ponds were designed with 3/1 slopes and all of the liner was cover with 12 inches of sand by Manthei Development.

Testing field seams

Four panels were installed in the primary pond on the second day.  All installation and testing was performed by EPI personnel.

The covered PVC geomembrane in these ponds will provide years of leak free, maintenance free protection of natural beauty of the Shanty Creek Resort.

For more information, contact EPI at 1-800-OK-LINER.

 

MAIN LINKS
Installation
Thermal Welding
Durability
Case Studies
Solutions
Quality Control Manual
Published Papers
Enhancing our environment by preserving water resources for future generations