Solutions


Problem:

Regulations require that all pollutants in run off water from buildings and parking lots in a new 68 acre retail development must be contained before storm water can be released into a nearby stream.

Solution:

30 mil PVC lined storm water detention ponds developed as part of a massive water feature at Grand Traverse Crossings retail mall.  Walton Excavating used EPI for PVC geomembrane material and installation on this fast track design-build project.

Wetland Pond

PVC geomembrane was used to line the water features and storm water ponds to prevent any leakage of water.  Storm water is released into a natural wetland area after retention in the lined portion of the ponds.

Water Feature

Floating aerators were added to aerate the water and add striking visual impact to the entrance to Grand Traverse Crossings.

Collection Pond

Run off collection ponds are extensively landscaped to add visual excitement to the development.

Recirculating pond

Water is re-circulated through the water features between storm events.

Bubble Fountain

The bubble fountain and water fall add sound to the landscape.

Cascade falls

30 mil PVC from EPI made this project affordable and secure.

For more information contact EPI at 1-800-OK-LINER.